Communications Center

Social building designed in 3 levels, which shelters all the required services for the West Fabrik.

The lower lever has a 2,160 m2 construction area; a grand vestibule frames the building access, and leads to the 8 dressing rooms and 81 showers divided for each production area, with an integral air injection and steam extraction, besides sanitary modules. It also has a fire station and a medical services Area with an emergency room, two doctors’ offices and labor medicine area, all equipped with the required installations such as air conditioning, voice and data, oxygen, etc. Also located in the lower level is a 30-car garage. The engine room has a water heater and storage which keeps the water al a constant 36°C.

In the first level there is a Banking Area, Kitchen and industrial Mess Hall which service approximately 750 people per shift; it has air extraction and firefighting installations, etc. All the finishes on this level are high-quality; the Interceramic brand floors have epoxy joints to prevent any filtration to the lower level. This level has a 2,160 m2 area.  A pure-white, rolled steel sheet over a frame attached to the walls was installed continuing with the client’s corporate image, but distinguishing this building over the others which are destined to production.

In the third level there is a warehouse with a mechanical frame system for chassis, which was built with a steel structure and R101 sheet steel roofing and grey, cold-rolled sheeting for the facade.


Insulated footings and reinforced-concrete grade beams form the foundations of this building, with a hybrid structure made of steel and reinforced concrete. The suspended slabs for levels and roof are of A-36 metallic structure, with Losacero system.

Note:

This presentation only lists our most representative works which we have with our different clients. This is not the totality of contracts awarded us to date.

The list does not include the great number of works carried out by the founding partners of the company, as those are part of their professional CVs throughout the more than 25 years of ample experience in diverse branches of construction.

 

Recent Projects

  • 1
  • 2
  • 3
  • 4
  • 5

Communications Center

Project: Construction of Civil Work, Electrical, Auxiliary Energies, Air-conditioning Installation and finishes of the Communications Center inside the Volkswagen de México plant, Puebla Pué. Start date: February 02 2009. Delivery date: February......

Test Track

Construction of test track for dt (phase 1), located in the municipality of Oriental, Puebla, for Volkswagen de México SA de CV. Starting date: October 08, 2009 Delivery date:  Aplril 04, 2010

Dynamometer Chambers

Project: Construction of the Silao Dynamometer Chamber for Volkswagen de México , Silao, Guanajuato.Starting date: December 2010. ::::  Delivery date: December 2011. Project: Civil works, Dynamometer Medernizing Bay 70 at Wolkswagen......

Press Bay

Project: Construction of the new Press Bay for Volkswagen de México, S.A. de C.V., Puebla, Pue. Starting date: June, 2008 Delivery date: July, 2009

Engines Bay

Project: Construction of Engines Bay for Volkswagen de México, Silao, Guanajuato, Mexico. Starting date: November, 2010 Delivery date: December , 2011

Torres N

torresN.com