Engines Bay

This bay consists of a 59,328 M2 construction area with heights that range from 10 to 14 meters inside. In this project were built spaces such as the Penthouse (area in which the electro-mechanical installations are housed), the logistics area (warehouse and loading bays), production (engine manufacturing and testing lines), sanitary modules, coordination sheds and dynamometer chambers.

The metallic structure was made through an efficient calculus program to optimize its proper density, using high-quality, A-50 steel. The facade was built with silver grey,.20 caliber, steel sheet, to which vertical, aluminum-frame glass windows were incorporated, thus achieving to conserve the customer’s corporate image.

A Cover System was built through a .22 caliber Deck, to which 2” mineral rock insulation was mechanically overlaid as thermal insulation and fireproofing. Later, a TYPE 0.060” waterproof membrane was installed, thus achieving a high-durability, low-maintenance system with a 15-year warranty.

The reinforced concrete floor was designed for the specific workloads as required by the client, resulting in the construction of a 20 centimeter depth floor of MR-42 concrete of low contraction and with construction joint spacings every 24 meters, achieving a low-maintenance product for wear at the joints. Finally, an epoxy finish in different thicknesses and colors was applied.

Note:

This presentation only lists our most representative works which we have with our different clients. This is not the totality of contracts awarded us to date.

The list does not include the great number of works carried out by the founding partners of the company, as those are part of their professional CVs throughout the more than 25 years of ample experience in diverse branches of construction.

 

Recent Projects

  • 1
  • 2
  • 3
  • 4
  • 5

Communications Center

Project: Construction of Civil Work, Electrical, Auxiliary Energies, Air-conditioning Installation and finishes of the Communications Center inside the Volkswagen de México plant, Puebla Pué. Start date: February 02 2009. Delivery date: February......

Test Track

Construction of test track for dt (phase 1), located in the municipality of Oriental, Puebla, for Volkswagen de México SA de CV. Starting date: October 08, 2009 Delivery date:  Aplril 04, 2010

Dynamometer Chambers

Project: Construction of the Silao Dynamometer Chamber for Volkswagen de México , Silao, Guanajuato.Starting date: December 2010. ::::  Delivery date: December 2011. Project: Civil works, Dynamometer Medernizing Bay 70 at Wolkswagen......

Press Bay

Project: Construction of the new Press Bay for Volkswagen de México, S.A. de C.V., Puebla, Pue. Starting date: June, 2008 Delivery date: July, 2009

Engines Bay

Project: Construction of Engines Bay for Volkswagen de México, Silao, Guanajuato, Mexico. Starting date: November, 2010 Delivery date: December , 2011