Construction of test track for dt (phase 1), located in the municipality of Oriental, Puebla, for Volkswagen de México SA de CV.
Starting date: October 08, 2009
Delivery date: Aplril 04, 2010
The project was divided into several stages, the first of which consists of a road 2 km. long and 6m wide. Our company engineered the pavement design for the track. For this task, we worked in the development of field studies such as soil mechanics, topography, and altimetry and pavement design. Besides the track, we built a warehouse, offices, mechanics’ shops, restrooms, maneuvers patio, maintenance warehouse, batteries area, fuel tank warehouse, almost 330 sq. m. construction plus patios.
The asphalt concrete used is of high-specification, due to the flatness and grain required by the tests which are carried out to automobiles on this track.